TO THE QUESTION OF USE OF 3VL80S ELECTRIC LOCOMOTIVES AT THE SECTION TASHGUZAR - KUMKURGAN OF THE UZBEK RAILWAY

К ВОПРОСУ ИСПОЛЬЗОВАНИЯ ЭЛЕКТРОВОЗОВ 3ВЛ80С НА УЧАСТКЕ ТАШГУЗАР – КУМКУРГАН УЗБЕКСКОЙ ЖЕЛЕЗНОЙ ДОРОГИ
Цитировать:
TO THE QUESTION OF USE OF 3VL80S ELECTRIC LOCOMOTIVES AT THE SECTION TASHGUZAR - KUMKURGAN OF THE UZBEK RAILWAY // Universum: технические науки : электрон. научн. журн. Ablyalimov O.S. [и др.]. 2023. 2(107). URL: https://7universum.com/ru/tech/archive/item/15033 (дата обращения: 26.04.2024).
Прочитать статью:

 

ABSTRACT

The substantiation of the kinematic parameters of the movement of freight trains and energy efficiency indicators of 3VL80S electric locomotives on the mountain section of the Uzbek railway in quantitative terms is given. The numerical values obtained by the authors are recommended for practical use in assessing the difficulty of the track profile of each section of the Karshi-Termez railway line of the Uzbek railway.

АННОТАЦИЯ

Приводится обоснование кинематических параметров движения грузовых поездов и энергетических показателей эффективности электровозов 3ВЛ80С на горном участке Узбекской железной дороги в количественном исчислении. Полученные авторами численные значения рекомендуются для практического использования при оценке трудности профиля пути каждого перегона железнодорожного направления Карши – Термез Узбекской железной дороги.

 

Keywords: investigation, result, the freight train, the electric locomotive, railway, traction mode, idling and braking mode, mountainous.

Ключевые слова: исследование, результат, грузовой поезд, электровоз, железная дорога, режим тяги, режим холостого хода и торможения, горный.

 

These studies were carried out in parallel with studies [1] for freight trains with a fixed mass of the composition Q = 2500 t and the number of axles m = 200 axles in the composition, which were driven by main three-section electric locomotives 3VL80S without stops and with stops at separate points of the mountain section Tashguzar - Boysun - Kumkurgan of the direction Termez - Karshi of the Uzbek railway.

The results of research [2-4] by scientists from near and far abroad, which, having a certain scientific interest and practical significance, are completely unrelated to the substantiation of the parameters of the main indicators of the energy intensity of the transportation work of traction rolling stock in relation to the real conditions for organizing freight rail transportation on the sections of Uzbek railways.

The purpose of the research was to substantiate the kinematic parameters of the movement of these freight trains and the main indicators of the transportation work of 3VL80S electric locomotives with an assessment of the traction quality of the hauls of the track profile of the Tashguzar-Kumkurgan section.

The mentioned assessment was made not according to the virtual characteristics of the track profile [5], but according to the total (total) and specific consumption of electric energy for train traction.

As a basis for the implementation of the research goal, we take traction calculations for 3VL80S electric locomotives when they drive freight trains with a train mass Q = 2500 t and the number of axles m = 200 axles on the Tashguzar – Kumkurgan section, performed by the authors taking into account the recommendations [2] and the initial data [6].

The results of the said traction calculation are presented in table 1 and table. 2, the analysis of which shows that the movement of freight trains without stops at intermediate stations allows:

- reduce the train travel time by 13.69 minutes and increase the technical speed by 2.51 km/h with an average estimated time per stop of 1.71 minutes;

- have a share of movement in modes traction of 25.49%, and idling and braking in 74.51%;

- in relation to the time of the train with stops, reduce the time of movement in the mode traction and in the idling and braking modes, respectively, by 4.14 and 9.55 minutes.

Table 1.

Travel time of a freight train on hauls per passage and intermediate stations for deceleration – acceleration

in order

Intermediate

stations

Distance, km

Travel time, min

Deceleration time/

acceleration, min

1

Tashguzar

-

-

-/2,00

2

Dehkanabad

56,625

66,50

2,45/0,43

3

Acrobat

52,425

68,43

1,27/0,26

4

Aknazar

17,700

43,00

1,68/0,78

5

Shurab

9,625

20,66

0,58/0,78

6

Darband

8,000

16,25

1,72/0,38

7

Boysun

20,625

26,15

2,07/0,39

8

Tangimush

33,375

37,70

2,34/0,51

9

Kumkurgan

22,075

27,91

1,31/-

 

Total

220,375

306,60

1,68/0,69

 

In table. 3 and in fig. 1 (when moving with stops at intermediate stations) shows the results of calculations of the total and specific consumption of electricity consumed by 3VL80S electric locomotives when they perform transportation work on hauls and on the Tashguzar-Kumkurgan section.

Table 2.

Travel time of a freight train when moving along hauls and on the section Tashguzar - Kumkurgan of the Uzbek railway

in order

Stages (hauls)

Train running time (without stops / with stops), min

on the haul

in mode

in traction

idling and braking

1

Tashguzar - Dekhkanabad

66,50/68,40

26,62/26,47

39,88/41,93

2

Dehkanabad - Acrobat

68,43/70,09

42,55/43,47

25,88/26,62

3

Acrobat - Aknazar

43,00/44,70

0/0,63

43,00/44,07

4

Aknazar - Shurab

20,66/22,00

0/0,12

20,66/21,88

5

Shurab – Darband

16,25/17,25

0/0,12

16,25/17,13

6

Darband – Boysun

26,15/28,55

5,64/6,27

20,51/22,28

7

Boysun – Tangimush

37,70/41,00

2,94/3,82

34,76/37,18

8

Tangimush - Kumkurgan

27,91/28,30

0,40/1,39

27,51/26,91

 

Tashguzar - Kumkurgan

306,60/320,29

78,15/82,29

228,45/238,00

 

Table 3.

Electricity consumption by electric locomotives 3VL80S during the movement of a freight train on the section Tashguzar - Kumkurgan of the Uzbek railway

in or

der

Stages (hauls)

Total for hauls and section A, kWh

Specific for hauls and section a, Wh/tkm brutto

without stops

with stops

1

Tashguzar - Dekhkanabad

5582,5/39,43

5564,5/39,31

2

Dehkanabad - Acrobat

7955,9/60,70

7976,9/60,86

3

Acrobat - Aknazar

345,9/7,82

413,3/9,34

4

Aknazar - Shurab

148,5/6,17

186,5/7,75

5

Shurab – Darband

105,6/5,28

146,5/7,33

6

Darband – Boysun

1240,7/24,06

1253,7/24,31

7

Boysun – Tangimush

910,7/10,91

1034,0/12,39

8

Tangimush - Kumkurgan

330,5/5,99

396,9/7,18

 

Tashguzar - Kumkurgan

16620,3/30,17

16972,3/30,88

 

Figure 1. Dynamics of electric energy consumption by electric locomotives 3VL80S on the hauls of the section Kumkurgan - Tashguzar of the Uzbek railway

 

As a result of the research, the following values of the main indicators of the use of 3VL80S electric locomotives on the Tashguzar-Kumkurgan section were obtained:

  • estimated net travel time of a freight train for hauls and for acceleration-deceleration at intermediate stations;
  • driving freight trains without stops, in comparison with similar driving with stops, provides a reduction in total and specific electricity consumption by 2.07 and 2.33 percent;
  • Electricity consumption for train traction for one stop at intermediate stations, on average, is 44.00 kWh/stop;
  • the average value of the mentioned electricity consumption for the four hauls of the section is, respectively, 285.80 kWh and 7.90 Wh/tkm gross - traffic with stops;
  • 232.63 kWh and 6.32 Wh/tkm gross – non-stop driving;
  • on the two hauls Tashguzar - Dekhkanabad and Dekhkanabad - Acrobat, there is an increase in the total (specific) consumption of electrical energy, in comparison with its average value, on average, respectively, by 19.46 ... 24.00 (4.89 ... 6, 24) and 27.91...34.20 (7.70...9.60) times.

Thus, numerical calculations have established that the stages Tashguzar - Dekhkanabad and Dekhkanabad - Acrobat are the most difficult stages in the mountain area Tashguzar - Kumkurgan.

As a result of the research, the authors obtained numerical values of the kinematic parameters of the movement of freight trains and the consumption of electric energy by 3VL80S electric locomotives in quantitative terms, which can subsequently be used for a feasibility study of the electric locomotives working on mountainous sections of railways, including Uzbek ones.

 

Reference:

  1. Ablyalimov O. S. To increasing the efficiency of operation of 3VL80S electric locomotives on the kumkurgan - tashguzar section of uzbek railway [Text] / O. S. Ablyalimov, J. K. Yakubov, KH. R. Qosimov, A. N. Avdeyeva, U. I. Safarov // Journal "Universum: technical sciences". - Moskow, 2023. Vol. 7, No. 2(107) – pp 43-49.
  2. Nekhaev V. A. Some mathematical aspects of the study of a “rigid” dynamic model describing the interaction of a wheel and a rail [Text] / V. A. Nekhaev, V. A. Nikolaev // Scientific and technical journal Izvestia Transsib / Omsk State Transport University. - Omsk, 2015. No. 4 (24). - pp. 45 - 56.
  3. Michal G, Huynh N, Shukla N, Munoz A, Barthelemy J (2017) RailNet: A simulation model for operational planning of rail freight. Transportation Research Procedia 25: рр. 461-473.
  4. Li S, Lv H, Xu C, Chen T, Zou C (2020) Optimized Train Path Selection Method for Daily Freight Train Scheduling 8: рр. 40777-40790 DOI: 10.1109/access. 2020.
  5. Ablyalimov O. S. Fundamentals of train traction [Text] / O. S. Ablyalimov, D. N. Kurilkin, I. S. Kamalov, O. T. Kasimov // Textbook for higher educational institutions of railway transport. Under the general editorship of O. S. Ablyalimov. - Tashkent: "Complex Print" nashriyoti, 2020. - 662 p.
  6. Ablyalimov O. S. To the study of the operation of electric locomotives on the section Tashguzar - Kumkurgan SJSRC "Uzbekiston temir yo'llari" [Text] / O. S. Ablyalimov, V. S. Kudryashov // Vestnik TashIIT, No. 2. - Tashkent: TashIIT, 2011. - pp 29 - 33.
Информация об авторах

Candidate of Technical Sciences, professor, professor of the chair «Loсomotives and locomotive economy», Tashkent state transpоrt university, Uzbekistan, Tashkent

канд. техн. наук, профессор, профессор кафедры «Локомотивы и локомотивное хозяйство» Ташкентский государственный транспортный университет, Узбекистан, г. Ташкент

Assistant «Loсomotives and locomotive economy» Tashkent state transpоrt university, Republic of Uzbekistan, Tashkent

ассистент кафедры «Локомотивы и локомотивное хозяйство» Ташкентский государственный транспортный университет, Республика Узбекистан, г. Ташкент

Senior lecturer of the chair«Loсomotives and locomotive еconomy» Tashkent state transpоrt university, Republic of Uzbekistan, Tashkent

ст. преподаватель кафедры «Локомотивы и локомотивное хозяйство» Ташкентский государственный транспортный университет, Республика Узбекистан, г. Ташкент

Candidate of Technical Sciences, аssistant professor of the chair «Materials science and mechanical engineering» Tashkent state transpоrt university, Republic of Uzbekistan, Tashkent

канд. техн. наук, доцент кафедры «Материаловедение и машиностроение» Ташкентский государственный транспортный университет, Республика Узбекистан, г. Ташкент

Master, аssistant of the chair«Loсomotives and locomotive еconomy» Tashkent state transpоrt university, Republic of Uzbekistan, Tashkent

магистр, ассистент кафедры «Локомотивы и локомотивное хозяйство» Ташкентский государственный транспортный университет, Республика Узбекистан, г. Ташкент

Журнал зарегистрирован Федеральной службой по надзору в сфере связи, информационных технологий и массовых коммуникаций (Роскомнадзор), регистрационный номер ЭЛ №ФС77-54434 от 17.06.2013
Учредитель журнала - ООО «МЦНО»
Главный редактор - Ахметов Сайранбек Махсутович.
Top