Металлургия, материаловедение и горное дело
Preliminary hydrometallurgical processing of converter dust from copper smelting production by sulfuric acid leaching method
21.08.2026
50
Semi-industrial tests on the processing of refractory carbonaceous gold-bearing ores using combined methods
07.08.2026
74
Mathematical modeling of the process of oil purification from ultradispersed abrasive particles
31.07.2026
89
EXERGY-BASED ENERGY EFFICIENCY ASSESSMENT AND OPTIMIZATION OF INDUSTRIAL VACUUM DEGASSING OF LOW-CARBON STEEL
21.07.2026
95
DEVELOPMENT OF DIGITAL MONITORING SYSTEMS AND SMART MINE TECHNOLOGIES IN UNDERGROUND COAL MINING
18.07.2026
98
ECONOMIC EFFICIENCY OF USING SURFACE MINERS IN THE DEVELOPMENT OF THE TAUSHAN GOLD DEPOSIT
17.07.2026
91
STUDY OF THE INFLUENCE OF ORE GRANULOMETRIC STRUCTURE ON GOLD RECOVERY DURING FLOTATION CONCENTRATION
18.06.2026
153
TECHNOLOGICAL LIMITATIONS OF LASER AND SANDBLAST ENGRAVING ON GLASS AND COMPLEX SHAPES: A COMPARATIVE ANALYSIS
13.06.2026
186
FORMATION AND PROPERTIES OF NICKEL–COPPER DIFFUSION COATINGS ON STEELS PRODUCED BY THERMOCHEMICAL TREATMENT
12.06.2026
189
APPROACHES TO ASSESSING THE BENEFICIENCY OF OXIDIZED AND MIXED COPPER ORES BY PHYSICAL-MECHANICAL METHODS
12.06.2026
190
STUDY OF THE LOCATION AND MINERALOGICAL COMPOSITION OF OFF-BALANCE ORES AT THE KALMAKYR DEPOSIT
04.06.2026
235
JUSTIFICATION OF THE GEOMECHANICALLY-ALLOWABLE HAUL DISTANCE FOR NEAR-WALL WASTE DUMPING IN DEEP PORPHYRY-COPPER OPEN-PIT MINES
04.06.2026
193